Design & first fix
Smart home design and first-fix cabling for renovations
The cheapest time to make a house smart is while the walls are open. An hour of design at drawing stage saves thousands later and avoids the compromises that come from retrofitting into finished plaster.
- Drawings marked up
- Cable schedules issued
- Coordinated with the trades

North & North West London
Design first, cable once
We work from your architect's drawings, marking screen and speaker positions, keypad locations, camera and intercom points, access point positions and the rack location. You get a cable schedule the electrician can follow and a rack layout the builder can allow space for.
On site we attend at first fix, run and label everything, then leave clear photographs of cable positions before plastering. That record is what makes second fix quick and lets you add to the system in five years without opening walls.
We are used to working around a main contractor's programme, and to speaking plainly with electricians, interior designers and lighting designers so the technology fits the design rather than fighting it.
What the job includes
What we deliver on a project
Marked-up drawings
Every technology position shown on plan, agreed before first fix begins.
Cable schedule
A clear list for the electrician: cable types, routes, terminations and labelling.
Rack and plant space
Ventilation, power and dimensions specified early so the space actually exists.
First-fix attendance
We run and label our own cables, or supervise where the electrician runs them.
Pre-plaster record
Photographs and measurements of every route, handed over as part of the job.
Second fix and commissioning
Devices fitted after decoration, then programmed and demonstrated.
How it works
New builds & renovations: from your first message to a finished job
- 01
Send drawings
WhatsApp or share the plans and tell us the project timescale.
- 02
Design meeting
We mark up positions with you, the architect or the designer.
- 03
Schedule and quote
Cable schedule issued and the works priced by phase.
- 04
First fix to handover
On site at the right stages, through to commissioning and handover pack.
Questions we get asked
New builds & renovations — the details
How early should you be involved?
As soon as layouts are settled and before first fix. Even a single design meeting at that point changes what is possible later.
Do you work with our electrician?
Regularly. We can issue the schedule for them to run, or run our own cables alongside them.
Can you work to a contractor's programme?
Yes. We plan our visits around first fix, plaster and decoration dates.
What if we cannot afford the full system now?
Cable for everything, install some. Cabling is the cheap part while walls are open; devices can follow later.
Do you cover flats and mansion blocks?
Yes, including work that has to respect freeholder and conservation restrictions.
Related work
Network & data cabling
Ethernet points, patch panels and structured cabling run neatly through period homes.
Smart lighting control
Scene lighting and keypads that replace a wall of dimmer switches with one clean plate.
Multi-room TV & video
One set of sources feeding every TV in the house, with no boxes under the screens.
More smart home
- Smart lighting control
- Automated blinds & shading
- Smart heating & climate
- Multi-room audio
- Multi-room TV & video
- Smart home security
- Whole-home control
- Aftercare & support
Free advice, no obligation
Tell us about the new builds & renovations you need.
Speak to an engineer on WhatsApp — Mon–Sat 8am–8pm, Sun 9am–5pm. We cover North & North West London and most jobs are finished in a single visit.